DOCUMENTATION / 06
Review and history
Leave targeted feedback, inspect edits, and restore a retained state.
Review feedback explains what should change. Editing history explains what did change. Use both to keep revisions understandable.
Add a focused review comment
- Open review for the intended work and select the target element.
- Enter a concrete comment beside that element, such as "Align this label with the input field."
- Finish the input or leave the field so the review's automatic save can complete.
- Check that the comment belongs to the correct element and review round.
Use an overall comment for page-wide feedback. Create and name a new review round when you need a distinct pass, then use review history to inspect earlier rounds.
Saving feedback does not automatically apply a design change or start an AI task. Ask for a revision explicitly, then compare the result with the comment's intended outcome.
Inspect editing history
Open the history view and choose a retained operation. Its preview is read-only: inspecting or playing past operations does not replace your current page.
Use previous and next controls to inspect nearby records. History playback illustrates retained edits; it does not execute your application's business events or recreate every action from an old session.
Mark and restore a milestone
Give an important retained state a recognizable name using the history's milestone or keyframe action. These history keyframes are named edit states, not animation keyframes.
Before restoring a state, inspect the selected record and finish any pending property input or file task. Confirm the restore deliberately. In supported history workflows, restoring creates a new undoable operation and preserves the earlier timeline.
History coverage and persistence depend on the document author. A page, a style document, and another independent workspace may have separate histories; do not assume that restoring one restores the entire project.
Keep durable backups
History has bounded retention and cannot replace a project backup. Referenced external images or fonts may also change or become unavailable, so an old state may need its original resources to look the same.
Before a large revision, copy or version the complete saved project. Read Projects and saving for file and recovery boundaries.